Bedrock Energy Corp.
Bedrock at a glance
The short version, for anyone who needs the shape of the project before the detail.

The company
- Ontario energy developer, incorporated 2017, privately held
- Reservoir and land positions in southwestern Ontario: Bayfield and Stanley
- Develops powered land: sites with their own generation, storage and grid connection
- Technical Feasibility Study filed with the IESO, 22 October 2026
The first project
- Bedrock Energy Centre, Municipality of Bluewater, Huron County
- 198-acre plant site on an existing Hydro One 500 kV corridor
- 1,300 megawatts of generation and storage on site
- Up to 1,000 megawatts of export capacity to the provincial grid
- A 500 megawatt connected campus served behind the meter
- Eight hours of long-duration storage; a three-day emergency reserve
- Phased 2029 to 2031
The storage
- Compressed air held in depleted gas reservoirs more than 500 metres down
- Reservoirs already exist: no cavern to excavate, the largest cost and schedule risk in competing designs
- De-designated from gas storage by the Ontario Energy Board in 2019
- Charged with electricity, discharged with stored heat; nothing burned
- First project of its kind in Canada; the technology has run abroad since 1978
What is still open
- Municipal support, which is mandatory for an IESO contract and which Bedrock does not hold
- The IESO connection study, now under way
- Environmental approval, well licensing and the regulatory pathway for air storage in these reservoirs
- An operator for the campus: in discussion, nothing signed
Longer answers are on Projects, Technology and the Q&A.